About Truluck

Truluck Construction was founded in Charleston, SC in 1936. Truluck Construction has since earned the reputation as one of the most highly regarded General Contractors in the Lowcountry, specializing in grading, paving, and utilities. Most recently, Truluck Construction launched a Marine Division that focuses on constructing docks, sea walls, bulkheads, sheet piling, riprap, concrete revetment, and precast bridges. Truluck Construction Dock & Marine works as a turn-key general contractor and subcontractor for many local marine contractors.

Truluck Construction Dock & Marine is capable of building turn-key projects, ranging from $1,000 to multi-million-dollar projects, for both private and government owners. Truluck Dock & Marine is the only dealer in South Carolina for Shore Station Hydraulic boat lifts and partners with many other suppliers, such as Tindall Corporation (specializing in concrete products and bridges).

Truluck Construction Dock & Marine would love the opportunity to provide you with the same quality and service that we have given the Lowcountry for the past 85 years.

Bridges

Bulkheads, Seawalls,
Retaining Walls
Commercial
Draining

RipRap
Erosion Control

Walkways

fEATURED Projects

Cooper Estates Boat Ramp

Truluck Construction is proud to have partnered with the Cooper Estates community in Mt. Pleasant to enhance their waterfront with a new concrete boat ramp, bulkhead, and floating dock. This project involved demolishing the existing 105-foot by 14-foot concrete ramp and constructing a new, extended 122-foot by 14-foot concrete ramp. Additionally, a new 60-foot timber bulkhead was built on each side of the boat ramp, complemented by an 8-foot by 40-foot timber floating dock. The floating dock was supported by newly installed timber piles, and a 25-foot by 3-foot aluminum gangway was also added to complete the project.

Dolphin Cove Marina

Dolphin Cove Marina needed to repair the damage caused by Hurricane Ian in September 2022. Construction repairs included demolition of both concrete and timber piles. New timber piles were installed and ranged in lengths of 35’ to 65’. A total of 9,248 SF of new docks and tee heads were installed.

Clark Island Marina

Clark Island Marina is located along the Stono River and is part of the Ross Marine family. The addition of this marina was a project we were thrilled to be a part of.

Click To Learn More

As the General Contractor, Truluck Construction Dock & Marine had a hand in every detail of building this marina. Clearing, demolition of two existing buildings, and grading nearly 3.5 acres were all landside activities led by Truluck in preparation for the construction of two 50’ high dry stacks with 160 boat racks, new parking lot, and future development at Clark Island Marina.

In the water, Truluck Construction Dock & Marine partnered with S.J. Hamill to pour concrete piles. Beautiful, new floating docks were positioned and placed – all designed with easy, long approaches to help simplify the docking process.

Phase two of this construction is planned to begin in late 2023 and will conclude with a total of 300 boat racks on two 50’ high dry stacks.

West Ashley Greenway Bridge

Truluck Construction was proud to work with the City of Charleston and CWS on this project to provide the community with a new, larger, and safer bridge on the West Ashley Greenway.

Click To Learn More

Construction activities included removing the existing wooden bridge and supporting piles spanning Long Creek along the West Ashley Greenway. The wooden bridge was replaced by a 90’ prefabricated aluminum bridge.

A major CWS sanitary sewer pipe runs adjacent to the bridge and was supported by the original bridge. This project required precision and focus to ensure work was handled carefully, not to disturb the pipe while demolition and construction activities took place.

Truluck Dock & Marine Customers

CONTACT NOW!

For any inquiries, questions or commendations,
please call: 843-766-5571 or fill out the following form

Phone Number

Address

1012-A St Andrews Blvd.
Charleston, SC 29407

SEND NEW MESSAGE

11 + 7 =